The Challenge:
The largest application of actuators in the city. Critical operation of the gates and valves for the main sewage flows from being discharged into the Hudson River unless under emergency circumstances then the critical operation of the actuator working with the valve and gate needs to be optimized.
The Solution:
- (6) 3500 Fail Safe On Command Actuators for (6) 84″ x 146″ Influent Gates
- (4) 3500 Fail Safe On Command Actuators for (4) 36″ x 48″ Forebay Gates
- (2) Custom Control Panels with HMI’s for all actuators with backup isolated relays for each actuator
- (2) HMI Screens to operate (6) Actuators for Influent Gates inside Central Control Center
- (6) Panels ONLY Open and Close at each actuator
- Diesel Generator for redundant Back-Up Power
The Result:
- Completely customized installation for 350 Million Gallons per Day WWTP
- Largest MGD WWTP plant with this size of Trident Actuators